Hydraulic Engineering Design Project Proposals

Group

Members

Proposed Project

Project Update

1

Alex Chan, Rukundo Gahigiro, Ning Zhang

Low water crossing on Brushy Creek

Brushy Creek

2

Kelly Best, Chelsea Burkett, Shannon Sullivan

Rain garden system for CPE

CPE Rain Garden

3

Osama El-Quqa, Sarah Seraj, Luis Galindo

King Abdulaziz University in Jeddah

University Drainage

4

Brent Crawford, Stephen Zhao, Zaid Admani

Pervious pavement on Speedway

Speedway pavement

5

Rosie Schneider, Andrew Martin, Benjamin Chilton

Drainage from ECJ Parking Lot

ECJ Parking Lot

6

Ben Beverly, Ben Steger, Austin Henson, Lauren Goulding

LID for Waller Creek

Lee Elementary School

7

Albert Bedia, Cassandra Pham, Juan-Pablo Gevaudan

Pervious Paving and Street Runoff

Porous Pavement

8

Chris Mercado, Marie Thornton, Antonio Ramirez, Fitsum Tesfa

Flooding and erosion on Waller Creek

Erosion at Eastwoods Park

9

Zachary Steeg, Janelle Wong, Yu-Han Yang

Bioretention on Trinity St

San Jacinto Blvd

10

Phillip Kenny, Alexis Sheehan, Abby Stout

Drainage from Burdine Hall

Burdine LID

11

Juhn-Yuan Su, Matt Strumeyer, Scott Cameron

Flooding on East 45th St

East 45th St

12

Julia Cavell, Peter Erni, Sam Kunz

Drainage Planning for Jeddah

Jeddah Drainage

13

Carolina Hernandez, Jackelin Leal, Leif Moore

Runoff and erosion on Waller Creek

WallerCk erosion